If the capacity of water Tank is 50000 Liters situated at 20
meters height from ground level,What would be the size of
pipe and how much USGPH water will be supplied and what will
be the motor or pump rating used for this work?Illustrate by
showing formula?
Answer Posted / rk
50000X20/3960=252.5 KW which means 340 H.P Motor capacity approx.Rest is how to calculate pipe size for this motor rating and how much water in USGPH is lifted?
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How much pf maintan in dg set in 6o% load,when Dg runnig Neutaal Earthing removed what happen.
two phases with neutral supply can be taken in 3C X 10 sq.mm cable .
how we calculate the dick for a pole?
54 Comments Alok and Bhanu play the following min-max game. Given the expression N = 38 + X*(Y – Z) where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be?
How to calculate that clean water supply in one Day from 150 KLD STP?
why do we have spikes enough to burn electronic boards, when generators are not grounded
what is Different between Bilinear and Unilenier?
with 3 phase board on a 63 amp rcd is it ok to have 6 electrical showers 2 on each phase and what problems could happen
How to calculate the Harmonics losses in terms of cost/unit.
Trafo ratio is 11kV/6.6kv,Vector group is YND11. What will be the effect if secondary is used for earthed system.
WHY IS THE EARTH FAULT CURRENT ALWAYS LESS THAN THE NORMAL CURRENT??
How to identify the start and end of 3phase 12 lead motor if U1, U2, etc numberings are lost or erased.
what is the standard duration after failure EB power
We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?
What is the RME and explain the full form and what is the RME work?