Answer Posted / vaibhav kumar brijpuria
When to do Load testing:
Load tests are end-to-end performance tests conducted under
anticipated production load levels.
The primary aim of load testing is to determine response
times of critical business processes and transactions to
establish whether they are within Acceptable time frame or
not.
Load testing will also measure the capability of an
application to function correctly under load by measuring
the systems key performance indicators (CPU, MEMORY etc).
When to do Performance Testing:
The objectives of Performance Testing is to determine end-
to-end timing of various critical business processes and
transactions while the system is under low load with a
production sized database.
The best time to execute performance testing is at the
earliest opportunity.
Developing performance test scripts at such an early stage
provides opportunity to identify and resolve serious
performance problems and expectations before load testing
commences.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What are the three sections of a vuser script and what is the purpose of each one?
How do you load a load runner agent?
What are the element in the loadrunner controller?
What are the different sections of the script? In what sequence do these sections run?
What do vuser_init and vuser_end action contain?
Where are automatic correlation options set?
What is vuser-init section?
Which components have you used in loadrunner ?
What is the basic credentials should be provided while recording SAP-GUI?
When loadrunner is used?
What is the think time?
Difference b/w 9.1 and 9.5 Versions in LoadRunner?
How can we recording vuser scripts using vugen?
What in percentile graph?
What is the loadrunner start-transaction and its syntax?