Answer Posted / vidyasagar daley
We preforing different ratios for pcc purpose in
1:5:10,1:4:8 and 1:3:6 the above ratios are calculating by
using two methods those are:
1)coefficent method,
2)thumb rule.
Methode no(1:4:8): (0.46/4x1440)/50=3.3bags.
Methode no(1:4:8):((1.52/(1+4+8))x1440)/50=3.36bags.
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
Why you are leaving present job?
Differentiate first angle & third angle projection?
How to calculate material and labor required for 100 m2 plaster?
five requirements of infill panels for walls?
What are your goals?
what is your role of in previous company as a construction manager
115mm thickness brick work how to required mortar
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
What is pre-stressed concrete?
how water proof chemicals act in concrete to avoid leek?
how much cement sand n bricks required in im3?and how much in plaster?
What is the name of this multiplication factors ?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
how i get all type of short type question answer about civil engg
Why is the use of granular sub-base in concrete carriageways not preferred, explain?