What is the percentage of wastage in cement n how to control it?
Answer Posted / vishal
Wastage for cement is maximum 3%.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
which has high compressive strength between hollow block and brick masonry?
How to decide/consider the grade of bitumen for dbm.
Special thing in designing a overhead reservoir ? which is different from an ordinary design
What is meaning of tlc
Why the finite element method is lower bound solution?
How will you reduce the concrete flow after mixing the concrete
What is Critical path in Ms-Project ?
How much cement is require in one sqft area in a G+3 residential construction.
How will be cutting in timber plate size 600*400 column size
what could be the production cost of 1 cum of concrete by CP30 plant
in the construction of residential building what type of tank are used?where?why & what is its purpose?
WHAT IS YOUR EXPECTED SALARY?
how many material required for brickbat water proofing of toilets.
Difference between lime, distemper and plastic emulsion?