Answer Posted / chanderkant
divide the cum by 0.0283 it become cuft
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
Minimum concrete cover in slabs, columns, beams, foundation and other st?
how much need sand and cement for 1 cft roof construction?
How to increase a bearing capacity of soil?
How to plan a project
What is the use of extend command?
Define What is unit weight of normal concrete?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
How to calculate the force on a column of three story building. What should be the base concrete height?.
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
Is there the dry coefficient of cement is constant?
which steel is better for residential building tmt steel or hysd steel
load combinations how many types for staad design purpose?
though u r a civil engineer, y r u interested in tcs???