what is the minimum depth of cover required for pipes?
Answer Posted / yadaladileep
0.6 mtr
Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
what is the water-cement ratio of mix design while 30mpa in 7 days?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
Difference between pre-tensioning and post-tensioning.
What is the tensile strength of wood?
What is the release of lien?
How to activate isometric axes in cad?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
How is make concrete cube?
why do we not deduct volume of steel to find actual volume of concrete in practical???
what is the name of shuttering oil used in oman
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
What is the difference between linear dimension and aligned dimension?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel