Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the minimum depth of cover required for pipes?

Answer Posted / yadaladileep

0.6 mtr

Is This Answer Correct ?    15 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???

1894


what is the relation between pitch of steel and depth of slab?

3391


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2577


about higyway engineering

4366


how many types of survey and what are levelling instrument?

2122


How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated

2145


How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?

2299


how we calculate the grade of the Bituminous materials.?????

2278


What are the ingredients of pre-stressed concrete?

1208


what is shuttering co efficient?

1871


I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.

2244


why the openings of sieves are square io size?

1598


What is packing Factor ?

1413


What is the quantity of cement in mix m20 concrete?

1143


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

2059