Answer Posted / arunachalam subiramani
150*150*150mm is the correct
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how to remove the quantity of metal 1 and metal 2 in concrete
Explain the difference between slab and beam?
What is aggregate?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
What is rate of concrete surface rendering work per sqm
pile load testing procedure
Can we use the flyash bricks in brick bat coba?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
Draw the cross section of a boundary wall and label its part with detailing?
rimmer in pile foundation
What are the applications of modulus of elasticity?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
what is kribs is supporting?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.