what is cement mortar cube size and strength in 3days,
7days and 28days
Answer Posted / revathi.s
size=15cmx15cmx15cm, and strength depends on the grade of concrete
| Is This Answer Correct ? | 20 Yes | 11 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
what is the anchorage length of reinforcement.
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
What are new methods /technologies of pothole patching?
Define What is the force exerted by the Tacoma narrows bridge?
What is the snap size in civil and how can we create it?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
what is the difference between natural draught cooling tower and induced draught cooling tower
What are the basic use of runners and standards of pipelines?
Design a rectangular channel.
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
What are the steps involved in the concreting process?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)