Answer Posted / partha mitra
pls. mention the quantity of work?
for 1 cum concreate work and 1:1.5:3 ratio the cement
required is 8.4 bags.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
How much cement and water required for cement selery????
How to calculate brick work quantity?? Block work quantity??
How is calculate the cube molt
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
Define the various stages of the project planning process in construction.
What is the use of extend command?
how to calculate the weight of concrete
What is dead load impact load live load
What is need for setting limits?
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
What is difference between engineering stress and true stress?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
What are the methods of measurement? Describe it shortly
explain five benefits of using standard terminology in the measurement process?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building