Answer Posted / partha mitra
pls. mention the quantity of work?
for 1 cum concreate work and 1:1.5:3 ratio the cement
required is 8.4 bags.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Explain what are the skills required to become an architect?
How do you calculate reinforcement weight of steel?
Define What are the uses of alloys in daily life and how are alloys made?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
What is the difference between chamfer and fillet?
how to calculate quantity of bricks in circular manhole with examples.
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
a butt weld is specified by
what is the type of earthing
what is tension column?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
what is the difference b/w full length and cutting length?
What things you need to take care of before building a kitchen island?
What are the advantages of cad software’s?