Can anybody help me by attaching files , formats for
quality checks of common building materials like cement ,
concrete , bricks , sand and aggregates?


Regards,

Answer Posted / sridhar

Dear Chatterjee sir,

kindly mail me by attaching files , formats for
quality checks of common building materials like cement ,
concrete , bricks , sand and aggregates.
plz for me too.

My Id is sridhar.civil@ymail.com

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

though u r a civil engineer, y r u interested in tcs???

2171


I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

5564


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

1773


VAT and CST ? Which benefits for buyer ? Why benefits?

1401


how to caliculate required amount of cement and sand required for 1cu.m.

1737






What is the tallest man made structure in the world?

657


One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?

1855


how to calculate steel for slab or footings?

1185


Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

1580


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

1685


I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.

1875


Explain major difference between auto level and dumpy level?

745


5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?

8489


What is the use of mirror command?

756


What is absolute pressure? How absolute pressure is calculated?

672