Answer Posted / bunny
HVAC stands for Heating,Ventillation and Air
Conditioning.HVAC system includes Chillers,Air Handling
Units(AHU),Fresh Air Handling Units(FAHU),Fan Coil Units
(FCU),Boilers,Variable Air Volume Units(VAV),Constant Air
Volume Units(CAV) etc and all these equipments work
together to maintain the temperature(hotness and coldness)
of a building.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
sir, i preparing hpcl,ongc,barc,hal exams(instrumentation engg)pls send a placement papers
Punj lloyd is coming in our Jadavpur Universtiy campus for campus placement. Please send me some hints about the writtend exam. My email id is subratafriends@gmail.com
Can any one tell me what type of question asked for instrumentation and control interview panel??? pls mail ramashankar.goel@gmail.com
hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com
please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826
hello friends, can you please send me the model paper or question paper to be prepared for hpcl examinations????????? You can mail me at rahim_here@yahoo.com waiting for your reply........... help me .. plz.....
send me last 5 years questions asked in rrb chennai, for section engineer
any body please send me the old question papers of ongc test.
this site is owned by an nonsense
can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know
pls suggest suitable MOC of diaphragm for pressure measurement of UREA grade solution service fluid.
hye SAM acn u send your e mail id, so that i can solve my query through e mail?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
plz send me general of ongc
plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}