qty of cement,sand and aggregate (1:3:6) required for RCC
Slab size 1000 x 500 x 100 mm
Answer Posted / mugundhan.r
cement 7.2kgs
sand 0.015cum
aggregate 0.03cum
qty of concrete 0.05cum
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Form where IS456 is adopted in 1978?
What is meant by solid geometry?
define the strength
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
What is need for setting limits?
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
what is the formula for Mass of cement grout (Dg)=???
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
why development length = 50D . why not 100D
Explain the design for rcc multi-storied building?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor