Answer Posted / satyam shantanu
a temporary structure for holding workers and material
during erection,repair or decorating of a building.
| Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
what is the water-cement ratio of mix design while 30mpa in 7 days?
how to stop beam concrete between column
How did the romans get water up hills using aqua ducts?
Formula of mid span bar
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
What is the substitute of Mastic Asphalt?
Define Workability ?
how to calculate mivan shuttering matrial
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
what is pile and deam foundation
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
What is the diameter of the 3"inch nails?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
how much cement and sand required for 100sqm of wall plastering in different proportions