Answer Posted / satyam shantanu
a temporary structure for holding workers and material
during erection,repair or decorating of a building.
| Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
What is the difference between chamfer and fillet?
What are the materials used in building a gravity dam?
Define What happens to Load at yielding ?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
What is the procedure of concealed plumbing in toilets?
What are the methods of measurement? Describe it shortly
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
what is project?
what is directivity effect?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??