Answer Posted / satyam shantanu
a temporary structure for holding workers and material
during erection,repair or decorating of a building.
Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
What is difference between combin footing & rapt footing
residential buildings,mixing of concrete,structural,construction material,site handling.
Which IS Code/American Code applied for coupler test of steel
what is the clear cover for shearwall?
what is the exact dia of 8swg and 10swg gabion wire
how to calculate steel for slab or footings?
why demand factor less then 1 ?
What happens to Load at yielding ?
Slump Values for works?
Define mirror?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
Reinforcement details at hinged joint
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
how many time use of plywood shuttering and IS code