One Toe = 3.5 kw
20 * 3.5 = 70 kw
P = 1.732 * v * I * cos0
70000 = 1.732 * 415 * I * 0.8
I = 122 A
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
A 500 V shunt motor runs at its normal speed of 250rpm when the armature current is 200A. The resistance of the armature is 0.12 Ω. Calculate the speed when a resistance is inserted in the field reducing the shunt field to 80% of normal value and the armature current is 100A.
what is the requirement regarding earthing of Single conductor with AWA
What is “pu” in electrical engineering?
Why hydropower stations are preferred solution for meeting peak loads in grids?
Explain the terms real power, apparent power and reactive power for ac circuits and also the units used.
how to select overload-relay for perticular motor 1.for D.O.L. starter 2. for Star-delta starter ????
What is different between resistance grounding system and resistance earthing system?
Why can't we parallel the secondary circuits of two voltage transformers?
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.
What is the formula formula for Busbar sizing and what are the things to be consider for Busbar Calculation?
a governer in an Ic engine controls the
what is mean by Digital Logic Meter (DLM)
what is mean by kneepoint voltage? when it will happen? ( my doubt is, if CT secondary is open means ct get saturation or blas? what are factors are required for calculations? plz give currect anws:
What is the meaning of floating point earthing in battery backed systems ?
Define peak overshoot.