what is minimum reinforcement required for rcc works
Answer Posted / kodavali
as per is 456 minimum reinforcement required is 0.12% of
gross cross section area
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
how much repeitation for conventional and maivan formwork?
what is the difference between replacement of cement by groundnut shell ash
How do You Maintain a structure after getting cube test of low strength.
strength vs shape factor
why we use 19x9x9and 20x10x10 but not other
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
why are you joining in this (applied post) job and your aim for this job
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
Which tests are performed on soil to decide the type of foundation to be provided.
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.