adspace
please help me
i want that steel bar weight kg/foot if anyone have formula so
tell me .
Answer Posted / kumar
= (L/3.28)*d*d/162.162
L= length of bar
d= Dia of bar
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
plz.show development and anchorage length in simple diagram.
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
VAT and CST ? Which benefits for buyer ? Why benefits?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
Which is the latest version of solidsworks?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
please send me bhel questions on rupesh.017@rediffmail.com
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
can i get civil engineering test papers.......?????
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
HOw much % of premium on DSR-2013 currently
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
water leak detection system question & answer