Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why reverse power relay is used?

Answer Posted / edwin

generator intended to operate
in parallel must have reverse
power protection.
A reverse power relay monitors
the direction of power flowing
between the generator & the
bus.If prime mover failure
occured the generator main MCCB did trip/ open it will act
as a motor.The reverse power
relay detect this fault & act to
trip the generator circuit
breaker

Is This Answer Correct ?    1 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the best thing to protect the motor from running over full current. CT or O/L or pressure transducer at the given pressure rating

1522


While converting delta into star or star into delta ,the three values of resistances remains unchanged .Find out the value?Let In star R1=x;r2=x;R3=x On converting into delta,R12=x;R23=x;R31=x Find the value of x

1908


For R-L or R-C ckt,time constant formula is L/R and RC respectively and its unit is in sec.Pls tell me the derivation

3260


why do we use 25kv supply for traction purpose?

1892


Can anyone provide with a SLD for HT panel installation for a 33KV line and distribution end has three 1.5MV transformers. Is it suitable to use OCB or VCB and also provide me the suitable rating and its connection diagram.

3329


What should be the protection scheme for a 15kw, 3-phase motor working in a lathe machine.

2048


L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.

1085


Why do we need interlocking in a HT metering or Ring main unit switchgear?

2001


EXPLIAN THE IMPORTANCE OF POLY PHASE CIRCUIT.

2151


How can we find out LT UG cable fault (size,from-4*25mm sqr to 4*300mm sqr)? How mani types UG cable faults?

3044


please give me solution to rectify the emi(electromagnetic interference)

1893


What is cut-off rate?

1199


how is the connection of a 3 phase ct trivector meter done on a pole mounted transformer

1345


I have motor 1500 HP and , 4160 V , 60 HZ , then i need the rating of transformer which can feed that motor ??

1927


Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!

2071