Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many covering can be taken in the beam,column & slab also
stair-case?

Answer Posted / ajas

Under normal conditions provide clear cover
beam-2.5cm
column-4cm
slab-1.5cm
stair-case-1.5cm

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the most suitable foundation when construct a bird watching tower in a marshy land

1842


how much used soil in 1 brick of standard size?

2059


What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)

4160


What is the coeffiencent Friction Angle between Steel and Ashphalt?

2991


What are the different types of foundation?

1337


What goals do you have in your career?

2098


What is the use of offset command?

1129


how to calculate spacing rod in column

1936


Define relative co-ordinates?

1112


need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS

1863


how many material required for brickbat water proofing of toilets.

1998


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

2219


How many lbs are there in a yard?

1207


What is a bearing capacity of soil?

1285


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2439