how cubic feet cement,sand,aggregate required for 1 cubic feet
ratio=1,1.5,3

Answer Posted / arunkumar

cement = 3 kg
sand = 0.75 band
20mm metal =1 band

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing

3326


pls give me some basic informations in construction of a structure?

1595


What is reinforced concrete?

675


how to calculate number of bitumen for road asphalt

955


What is need for setting limits?

640






why the openings of sieves are square io size?

1090


How many bricks are there in 100cft?

824


importance of the soundness test to determine the quality of cement use for any construction

1684


CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY

713


at which depth the construction of tunnel is economical from cost and engineering aspect.

1302


What is the difference between absorption & adsorption and sorption?

739


Which are the top apps for you civil engineer?

712


What Reinforcements Are Used In The Process Of Prestressing?

827


What is labor and material payment bond?

625


On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??

2826