Steel calculation formala for column,beam and slab.
Answer Posted / vijay kumar.g
beams:(is 456-2000)
mini Asv =(0.85*b*d)/fy
maxi not greater than0.004bD
columns:(is 456-2000)
mini 0.8% of gross c/s area of the column
maxi not more than 6% of gross c/s area of the column but pratical purpose used 4% of gross c/s area of the column
slabs:(is:456-2000)
mini 0.15% of c/s area of the slab this value can be reduced to 0.12% when used HYSD bars
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
which red: used in roof teping, then use only cement
What are the problems one might face while having a Cantilever balcony?
In which code the the maximum height of concrete casting has been explained
How to find the cuplock pipe qty in staging for Minor bridge?
How much cement,sand,bricks and water needed for 1square metre brick work?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
Define polar co ordinates.
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
How to check slab shuttering level.? Or check list for slab ?
what is constat for brickwork
what is diffrence between catchment area,watershed and basin?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38