plz tell me
one brick total plaster area?
Answer Posted / pravin
bricks r usually use more ways as our wise
1. 7.5 grade brick have 6 faces
190mm x90mm x90mm
7.5" x3.5" x3.5"
area =3.5x7.5 x4=0.72sft
=3.5 x3.5 x 2=0.1687 sft
totally =.889sft in 7.5grade brick
Is This Answer Correct ? | 19 Yes | 7 No |
Post New Answer View All Answers
to draw bm diagrams for portal frames under different loadings//
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
What happens to Load at yielding ?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
What is type failure of road surface? how to repair the failure of road surface?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
give me the rate analysis for Bituminous Macadam and SDBC
why we use aggregate,sand with cement in concrete?
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
how to prepare site mix design