Answer Posted / jsrana
TS 456
| Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
how to calculate weight of 1.8 cum of aggregate
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
sir please send me campus placement questions in civil engineering
The 4 main factors to start a construction project are––
What is an ortho mode?
How many feet are in 4 square yards?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
reinforcement slab, beam and column formulas?
how much of the strength comes from post-production curing