In case of 3 phase motor why it is called single phasing by failure of one phare unless there is rest two phase are acting. ?
Answer Posted / guest
I woukd like to ask above question.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What happened if C.T mount at any cable or Bus bar in wrong direction . C.T going on proper work or not . C,T direction is essential thing to properly work.
What is the comparison between 30mA DP RCCB and 100mA DP RCCB and can replace it against 63A MCB
I had applied for JE in PSEB, Can you pls send me the Question bank for related to my field
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
we use 400/5A ct and 35/roor3KV,/0.1/root3KV,0.1/root3KV pt ratio. What is the multiple factor of this meter.
how invertor convert the dc into ac give brif detail
How the capacitance og capacitor volatage transformer is decided?
What is the function of auadag in a cro?
what is the solution for meger test failed the MV cable?
how to identify the cable quality and what is flame proof cable
The 3 phase Delta connection RB=440V, BY=350V,.......* is Line to Line voltage RY= ? And Formula....?
why we are using earth pit in sub stations.?
why genarator genarating voltage 11 KV?
What is the armature mmf in a D.C machine?
how is the cable tray designed & how its total length is calculated for an Industrial plant Say for Ex. (500KW Motor Load)