What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?
Answer Posted / lalit mohan upreti
Beam size 300 x 300,cover-40mm
less cover=300-40-40=220,
parameter of ring=2*(220+220)=880mm,
add for hock=10d=10*8=80mm,Where d=8mm
number of Hock=2
Total Hock length=2*10d=80*2=160mm,
Deduction for bend junction,for every junction less 2d,wherw d is the dia of Bar,
number of bend=5,
Total deduction =5*2d=5*2*8=80mm,
Total cutting cutting length of Ring=(Parameter of Ring)+ (Total hock length)-(Total bend deduction)
Total cutting length=880+160-80=960mm
Is This Answer Correct ? | 107 Yes | 17 No |
Post New Answer View All Answers
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
What is hybrid foundation?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
Why are separation membranes used between concrete pavement slab and sub-base?
Calculation of curtain wall of box culvert
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
Why is the statue of liberty made of copper?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
for pretensioning which will yield first and same for post tensioning?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)