What is D check in a Diesel generator for 1000kva DG
Answer Posted / sanath shetty
D-check (Every 3000- 5000 Hrs.)
1. Complete DG set should be dismental.
2. Turbo charger service
3. Injector Pin service
4. Cylinder Head service
5. PT Pump sevice &
6. Repeat the B-Check process.
If your DG set running hours more than 10,000 then in D-
Check You should
1. Change Piston Bearing,
2. Change nozels,
3. Piston Cylinder also need to be change.
4. Change Canopy filter if require
5. Check polution level
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
DESCRIBEPNEUMATIC SYSTM OF ASH HANDLING PLANT
what reactive how to maintain
if i am in front of transmission line how to know that current direction without any equipment
Why star delta starter is preferred with induction motor?
what id a dry type transformers and its function ?
Dear sir, my knowledge about cable size determination is limited. Though I read examples I could not calculate the Cable size required for electric driven pump 40 KW, 380 Volt, 50 HZ, 50 meter from transformer and it is three phase star delta starting. Please help as there is no one in my surroundings to help.
hi friends how 3 phase converter functioning ?what is working principle of rotory phase converter ?
what is counter poise conductors
At what speed 1 HP motor can run an electric car of weighing 400 kg?
Hello sir i m student of gtu .what is idp.
According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor
what is the minimum recommended leakage current of an earthed cable connected to the body or skid of an alternator
In PFI plant one stage capacitor connection is directly connected(with out megnetic contact controll). but why?
What are test signals and their significance?
what is the ckt diagram of a tubelight and is it the simplest ckt of electrical engineering and also the component?