eg:1:3:6(M10)nominal mix ratio(bcoz size of coarse aggregate is 45mm) for 2 cub.m of PCC
Req:
1)PCC unit weight = 2400kg/cub.m
2)sum of ratio = 1+3+6=10
Procedure:
(1/10)*2*2400 (i.e) (ratio of cement/sum of ratio)*cub.m of PCC*unit weight of PCC =480kg of cement (9.6 or 10bags)
Therefore sand=480*3=1440kgs
Coarse agg(45mm) = 480*6=2880kgs
Is This Answer Correct ? | 13 Yes | 13 No |
Post New Answer View All Answers
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
What is rate of concrete surface rendering work per sqm
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
States some of the commonly used commands in cad software’s?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
How long does it take concrete to harden?
How can i display 5 asterisk and another 5 asterisk )?
What is meant by Crystal Concrete?
Permissible wastage of cement as per IS code ? In which IS code I get it?
How to calculate carrying capacity of the existing water supply trunkmain
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
Define line type?
Define aligned dimension?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)