What should be the size (Cubic meter) of a water tank for
1000 Ltrs. capacity?
Answer Posted / lokender singh
1mX1mX1m
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
procedure for preliminary selection of size of column of 5 storey building
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
what is the types of surveying?which type of survey carrying for type of work?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
How to make tiles floor step by step procedure?
what could be the production cost of 1 cum of concrete by CP30 plant
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is progress payment?
How to arrive dry volume of concrete (1.52 to 1.57) ?
which formula used for calculate the area of segmental arch?
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab