Answer Posted / n rajesh guttedar
On soil classification we calculate the s.b.c. of different
soil it helps to structure design.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to find permissible diagonal tensile stress in reinforced brick work
what is the method used for marking of cantilevers in hirise buildings by using theodolite
how is the reinforcement is distributed in triangular slab
What is the meaning of a blue land surveyors flag?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
whaat is blister in box girder bridge and what is its function..
what's the formula for calculate pcc for matt(45mm aggregate)?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
How much of the strength of concrete comes from post- production curing?
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
What is c.g.i sheet which used for roof??
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
List out the potential risk factors for workers on the construction site?
What are new methods /technologies of pothole patching?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.