how much quantity of binding wire required for tieing of
1mt of reinforcement bar?
Answer Posted / seema
9 Kg/ MT is in idle condition but practicaly 12-15 Kg wire used becz of wastge and irrsponsibility of worker
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is factor not to be taken in consideration in mix design?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
what is meant by csr in foundation? what is sbc?what is meant by contour line?
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
Define What are the uses of alloys in daily life and how are alloys made?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
How many feet are in 4 square yards?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
How to arrive dry volume of concrete (1.52 to 1.57) ?
What is the strength of 1:6:12 mix?