what is correct temperature for pouring concrete?




Answer Posted / sjtbehera

idle temp. of placing of concrete is 27' c.

Is This Answer Correct ?    4 Yes 0 No






Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)

706


At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.

1002


How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM

798


How much cement will require for 1Rmt Skirting laying

967


Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?

668






How to construct a water sump in a rocky soil?

958


Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct

318


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data

2054


why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

7587


Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

801


How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.

322


difference between trapezoidal and pedestal footing and how the load acts on that

1638


How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?

1076


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

901


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

2585