concrete coverings outside steel
Answer Posted / ranjan
SLAB=25MM
BEAM=25MM
COLUMN=40MM
FOOTING=75MM
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
what is relation between SPT N value and driving piles after conducting a soil test?
Define What is the distance between railway tracks?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
What Are The Steps Involved In The Concreting Process, Explain?
What is the maximum strength of cub compress strength in one cub testing
Write short note on construction programme for pile foundation.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
How to arrive d*d/162 , for finding the kg per meter , wt of steel
What is the compressive strength of fly ash bricks?
what is pqc
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
how u design STAGING for Superstructure in BRIDGE construction?
Define polar co ordinates.
What is hybrid foundation?
roll of DLC in road constructions