Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the compresive strength of m20 concrete at 7 day

Answer Posted / ranjan

M20 7 days strength

Ft = t
-------- x f28 f28 is strength of 28 days
a+bt
a & b are imperial constants

a = 4.70
b= 0.833

given formula f 7 = 7
------------ x 20
4.7+.833 x 7

=0.665 x 20
=13.3

Is This Answer Correct ?    9 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why +1 to be followed for calculating the no of bars in BBS. Please explain

1969


can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.

1739


how much of the strength comes from post-production curing

2742


How many litres of water used for curing of 1000sqft of slav

1530


how i can tak Quantity of mortar in block work

2373


the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

2039


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

2414


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1468


What is the worlds largest concrete dam?

1229


How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

2146


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

2186


what is parametre for M25 after 7 days strength

1985


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

2122


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

2216


how much repeitation for conventional and maivan formwork?

2006