quantity of cement = 1/7=0.1428 cu.m
quantity of fine aggregate = 2/7 =0.2857 cu.m
quantity of coarse aggregate = 4/7 =0.5714 cu.m
total = 0.1428+0.2857+0.5714 = 1.000 cu.m
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
What is the likely strength of a 1:2:4 concrete mix?
Wat is meant by Aecron brick?
How to do base isolation using ETABS software?
pls give me some basic informations in construction of a structure?
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
what is project?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
how to convert sand in Cft to Kgs
In jack arch floor, the rise is kept?
Mention what are the composition of a landfill?
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
What is gravity flow?
In which code the the maximum height of concrete casting has been explained
What is type failure of road surface? how to repair the failure of road surface?