For Beam steel reinforcement detailing, in the End of the beam do the making of L shape in the rebar is essential in all the cases, specially in the ends of the Beam?
Answer Posted / mdnahid akhtar
it is compulsory to do bend in the end rregion of beam,because the maximum chances of deflection is always near the sopport.in some cases the concrete leaves the rib of steel,called sleepage. so to avoid the sleepage and to increase more tensile strength doing bend (L) is necessary.in cantilever no discussion .but in S.S beam it may run.
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
What is the exception critarea of cube?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
what are the duties of Site Engineer in work site?
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
What are the uses of alloys in daily life and how are alloys made?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
what is the meaning of 40/20 src
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
what is the difference between tsp & tower