concrete coverings outside steel
Answer Posted / milind
for slab=25mm,beam=25mm,column=40mm
| Is This Answer Correct ? | 10 Yes | 4 No |
Post New Answer View All Answers
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
what is called the inverd level of mabhole chamber?
What is the method of soil replacement test?
How to decide/consider the grade of bitumen for dbm.
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
For what building Built-on balconies are preferable? What are the advantages?
Would you cause a 55-gallon drum of water to weigh more by climbing in?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
a butt weld is specified by
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
how many minimum admixtures are used in water froofing structures
what is your role of in previous company as a construction manager
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
what is parametre for M25 after 7 days strength