Answer Posted / a s nath
Local Breaker Backup (LBB) or Breaker Failure Pretection is
associated with Busbar Protection. If breaker fails to
operate due to its inoperable condition in spite of
operation of protective relays, there will be damage to the
system.This condition is being monitored by LBB relay or
BFR relay (Breaker Failure Relay)and will initiate the
Busbar protection and thus clears the bus.
The LBB protection will operate under the following
conditions:
(i) Lockout relay should operate
(ii)Current shall be more than 20% of normal current rating
(iii) The above currents shall persist after a time,
generally 200ms
When all the three conditions satisfy,it is considered that
the breaker is stuck and LBB protection will operate to
clear the bus.
By A S Nath
Is This Answer Correct ? | 117 Yes | 8 No |
Post New Answer View All Answers
how to calculate single phase motor efficiency ?
List out the the types of Mounting Light fixture?
what is distribution board?
why Induction Generators are not "Black start" ? and apart from WTGs where this types of generator are generally used?
Explain the different methods used in the choice of rotor slots for reduction of harmonic torques in an induction motor.
How much voltage we need to apply in 33kv cable during hipot test of cable
if in 3-phase system voltage=440V,frequency=60Hz, current=400A. then if it is single phase then current=? and if it is single phasing then current=?
Which is the largest hydropower station in the world?
Why cables and busbar both needed in LT Panels?
how solar power plant energy meter multiplication factor
Is there a standard depth of gravel fill in Substation Switchyard? Please give a design/drawing. Thank you.
which protection function should measure RMS value of current&DFT value of current?
How to select the gauge of wire for winding of motors? How to select number of turns for winding of three phase induction motor?
sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company
What is power distribution criteria for converting single phase unbalanced residential load to 3 phase star connected balance system. Does total KW converted to 3 Phase. Means Divided by root 3.