From which end do you start deshuttering in
a) cantilever portion
b) simply supported portion
Answer Posted / subhasbabu
FOR CANTILEVER PORTION STARTS THE DESHUTTERING FROM THE
SUPPORTED END, AND FOR THE SIMPLY SUPPORTED ALSO STARTS FORM
THE SUPPORTED ENDS
| Is This Answer Correct ? | 7 Yes | 5 No |
Post New Answer View All Answers
What is the Unit weight of coarse sand (F.M- 2.20) ?????
what is the type of earthing
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
insted of bentonite we can use any alternate material in piling ?
Which is the direction for positive angle?
How to find permissible diagonal tensile stress in reinforced brick work
How to determine spacing of bars in slabs or beams
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
explain five benefits of using standard terminology in the measurement process?
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
List out some of the software program that can be useful for architect?
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
Explain what is alternate bid?