plz tell me max persantage of sand for every mix design by
volume or weight.
Answer Posted / sandeep kumar
30 to 40%
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
how to caliculate required amount of cement and sand required for 1cu.m.
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
How to testing voids of filled aggregate in bitumen mix design
Sir how to find cutting length for footing steel bars in the shape of "u"
Why should you consider yourself fit to be hired by jindal steel.
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
what is hydrostatic paradox?
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
how to caluclate sienerge qty in construction in ap
For what building Built-on balconies are preferable? What are the advantages?
What is Refuse Area In High Rise Building ?