after temping in cbr mould keep how many hours mould in water
Answer Posted / k.k
24hours
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
what is meant by residual strain?
what is the service corridor?
in design case of structural member best suitrable percentage of steel limit is what
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
What is the average density of soil?
how calucate cement sand ratio for plstering
what is work of planning deptt. in any construction compny (in road project)
What are the phases inspections are done by local authority while construction?
What is the maximum strength of cub compress strength in one cub testing
why do we provide haunches in rcc box or underpasses?
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1