Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is correct temperature for pouring concrete?

Answer Posted / manu

28 to 32 centigrade


Is This Answer Correct ?    15 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How do we calculate absolute pressure?

1292


what is the name of shuttering oil used in oman

2770


what is Brest Wall?

1289


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1945


Which is the best book for building construction?

1063


I need model question papers for writing the Dubai municipality exam,for G+1

10539


What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

2071


what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

2315


Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

2161


How do we determine the specific gravity of a cement?

1064


brickwork labour rate per cum ?

1559


how many kg of 20mm, 10mm, dust available in one ton stone boulder

1818


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1770


if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

2053


Mention different types of roof systems?

1121