why u want to work in sail/ntpc as u r already in an it
company where life is good, good environment no much
tensions etc?

Answer Posted / guest

NO Comparision any psu/navratan/maharatan/govt is far
better than any it company/software job in respect of
1) salary
2) job security
3) provide respectable position for an engineer
4) good work profile especially for civil,mech and
electrical
5)give u much oppertunity to apply your core technical
skill

Is This Answer Correct ?    17 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HI....HOW CAN BE MESARED THE VALVE OF NEUTRAL GROUND RESISTOR WHIC IS LOCATED AT SWICHGEAR ON GENERATOR SIDE....

1614


Can any one know what are the symbols at the down (below) the analog ammeter??? there are 4 symbols which are they ?????

1480


11kV capacitor bank of rating 2.4KVAR, is charged with protective relays of only over current & Earth fault &.......without Over Voltage, Under Voltage & Neutral Displacement Relay. Is it advisable??

1200


A 400KVA transformer has 400 Hz frequency. If the frequency is changed to 50 Hz, then what will be the new KVA rating?

1367


prove that power consumed in 3 phase delta system is 3 times as compared to 3 phase star system

1729






what is the control circuit for operating the clean room air shower

1740


Transmission through a short line depends on

1684


What is the equivalent circuit of a transformer and its vector diagram?

2179


what is the differation bewreen kwh & fundamental kwh in electronic trivector meters

1776


I have a situation to design sub-Distribution board/Panel meant for feeding power sockets. In the incomer CAN i Take TP MCCB with Neutral Link and All the outgoing feeders with to sockets with TP MCCB and Neutral Link? P.S : My System is IT Earthing

1323


For overhead protection we use which transformer?

1951


What are the factors which influence the choice of specific magnetic and electric loadings of a synchronous machine?

1601


What is difference between Sample test and Routine test in safety standard?

1296


What is given by the definition in BIL IMP/PF = 950/395 kV. This was found in a name plate of a power transformer.

1849


Why can't we parallel the secondary circuits of two voltage transformers?

981