I NEED RRB CHENNAI (JE ELECTRICAL) QUESTION PAPER FOR LAST
5 YEAR AND I NEED RRB (JE ELECTRICAL) SYLLABUS.PLEASE SEND
MY E-MAIL joo28_eee@yahoo.co.in
Answer Posted / raja
yes
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Why Ac Systems Are Preferred Over Dc Systems?
what r the checklist while installing 500 kva transformer
EHV current carrying parts need to have smooth finish,then how can a 245kv GIS with emery finish can run so long?
what is the minimum (Common factor) insulatin resistance of the following a, 4mm sq wire b, cable from 50 mm sq to 800mm sq
we have 3.5MVA-11/6KV transformer. how can we calculate earth fault current and NGR calculation?
1.why we are using blocks in withoutgaplightning arrester 2.why we ar using bushing in withoutgap lightning arrestor
Explain the following and how these are working with PLC Unit 1 I/O Module Card 2 Adaptor Card 3 Ribbon Adaptor 4 I/O bus 5 I/O Devices
Define the term factor of inertia.
The electrical energy required to raise the tempreture of a given amount water is 200 kwh. If the heat losses are 20%, the energy required is?
What is the importance of earthing?
relation between power station capacity and voltage level?
If i am running of spindle at 2000rpm ,but How to spindle stop at the second I am resetting the machine in CNC machines
How many turns are there in primary winding? (In Transformer)
how is the testing of an REF relay? what are the test REF circuit having?
how do i work out the Amps of a incommer if i am running 1 37 KW motor and a 0,75 KW motor and some solinoids