Answer Posted / vigneshwaran s
"DESIGN AND DRAWING"
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
How to calculate construction cost of residential building in mumbai
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
What is Refuse Area In High Rise Building ?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
Soil bearing capacity formula
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
Basic civil interview questionsÂ
Doul Bar reinforcement and details of drawing.
What are the methods of measurement? Describe it shortly
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
2. What are the advantages of your present job, things you like about it?
how to calculate the concrete mix m30 by volume
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11