Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

name three materials used in drainage work

Answer Posted / kunal

CEMENT SAND AGGREGATE NP2 PIPE OR NP 3 PIPE
KATHYA

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.

2243


what is pqc

1822


flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force

2024


I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks. 

2904


what is grade intersection?

2133


what isload waring calculation

2433


why is M30 grade Concrete use for Foothing & Column M50

3560


how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour

1641


What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?

2360


CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL

2227


Why are pull-out tests performed for soil nails?

1232


What is the difference between absorption & adsorption and sorption?

1253


For the construction project what capital cost has to be taken in consideration?

1201


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1924


what is work of planning deptt. in any construction compny (in road project)

2523