Answer Posted / arun
when the rod is 12.12M .but length of building height is
higher than 12.12m we are provided in lap length.
it is depending upon the rod diameter.
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
what is labour consume factor in residential projects
What is thumb rule in quantity and cost estimation of a residential building?
what is right & short method of measurement of slab&beam
Any strength is a stress but any stress is not strength
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
what is tension & compression of steel bending.
what is thumb rule for calculating the size of ISMB required for a particular length of span
Define What is the distance between railway tracks?
For fine aggregate which is most suitable River sand or crusher sand & why ?
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
What are the methods of measurement? Describe it shortly
What will be weight of 0.5mm GI sheet per sq.ft?
What is the minimum size of the particles of silt soil?
What is the force exerted by the tacoma narrows bridge?