Answer Posted / arun
when the rod is 12.12M .but length of building height is
higher than 12.12m we are provided in lap length.
it is depending upon the rod diameter.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
what do you understand by M25 concrete
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
Which are the top apps for you civil engineer?
What is the use of mirror command?
how to estimate material requirement for an area of house in square feet?
What is meant by scaffolding coefficient?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
how to calculate the chair reinforcement length in slabs, footing or anywhere??
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
What are the different types of foundation?
Which architectural movement is also known as jazz moderna?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????