What is OLTC in a transformer, specify its fuction.
Answer Posted / raj
OLTC MEANS ON LOAD TAP CHANGER
THE FUNCTION OF OLTC IS TO CHANGE THE VOLTAGE LEVEL OF THE
SECONDARY SIDE OF THE TRANSFORMER ACCORDING TO CHANGE IN
LOAD SIDE TO MAINTAIN THE CONSTANT VOLTAGE WITHIN THE LIMITS
AND ALSO ITS A SAFETY DEVICE.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the difference between hot and cold loop testing?
Where burned of electricity,when,who, & why.
we are small scale industry in production of rice & rice bran. Pls let me know how to take contract demand for our industry.. (for information we have total 600.hp)
When steam condenses and becomes water at the same temperature, the specific heat for the process in kJ/kg k is
1600 KVA ka transformer hi aghar lt side par 800A aur voltage 420 ho to HT side ki cable ki rating keya ho gi?
How does cost of generation from hydropower plant compare with other sources of electricity?
1. A 380 / 220 V r.m.s. 3-phase 4-wire circuit carries loads of 8 + j8.1 ohm; 4 + j4.1 ohm; and 2 +j2.1 ohmin the three phases respectively. The length of the circuit is 100 m, and the resistivity of the phase conductors is 0.0005 Ω/m. The neutral conductor is of the same size as the phase conductors. a) Select a reference angle 0for the first phase. Then write down the three phase voltages in both polar format and complex number format. b) Make appropriate assumptions, and take temperature effects on resistance is insignificant. Calculate the currents in the three phases. (Note: Determine conductor resistance, and apply Kirchhoff’s Voltage Law) Based on the result, suggest a main switch rating for the circuit. c) Show your preferred direction of neutral current in a diagram, and then determine its value. (Note: Apply superposition principle, and Kirchhoff’s Current Law) Use its magnitude to show that in this circuit, the unbalanced load may increase the voltage drop in some of the phases. (Note: Also observe the common volt drip in neutral) State your assumptions, if there are any. d) Suddenly the neutral wire of the circuit is broken. Estimate the new currents in the first phase, i.e. Phase L1. State your assumptions, if there are any.
If we have to feed a housing complex having load 8MVA, than what would be the better option, either we first step down 33kv supply into 11kv & than 430v or we proposed no of 33/.44 kv transformer, also which option is economical?
what is the best method of grounding in 30 MW generator?
What is load boxes ?
What is the de rating factor of cable? What is the importance of the de rating factor in cable selection?
what is th basic difference between a d latch time line and a d flip flop time line???
How to decide CT & PT ratings for a given transmission line carrying some rated voltage?
we need a ntpc previous papers
How to calculate mf when meter equipment and meter are connected