Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

If I want to buy a pressure switch & 3-way valve for hot
water application then witch parameter I should consider.

Answer Posted / arpita

For Pressure Swtich:
electrical parameter:- switched current, switched ac vtg. &
switched dc vtg.

Performance and operating parameters:- Temperature
compensation, Temperature output, Electrical output.
Switch accuracy


Is This Answer Correct ?    1 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir,would you please send me the Hindustan petroleum corporation limited papers(HPCL).my e-mail ID is ujjwal_sharma1983@yahoo.com

2287


Calibration procedure for electro magnetic flow meter

1923


need to calculate flow rate with the help of dp range and orifice bore dia and size. range is 0 to 400 inwc and orifice size is 12 inch 150 # rf and bore dia is 7.180 inch. need to calculation for flow rate

1266


Why is it necessary to use compensation leg to measure the liquid level in a closed or pressurized tank?

2392


Isometric drawings are generated during _________________ phase of a project

2030


please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826

2038


Where is wet leg is used?

1008


what is dc moter.

2167


If relative y axis vibration sensor is by passed, and relative x axis and absolute sensor is left working. how much monitoring i would have risked?

1401


How to Calibrate Level Troll in field

1336


Im having problems with interfase betwen SPI v7.0 and SPPID v5.05. Previous versions of Intools shoul be fixed with SPPIDproj.ocx file. It was necessary to replace this file with one that allows the connection between different versions of SPPID. It is necessary in the current version to do the same?Thanks

2260


Please can anybody help for control valve sizing step by step procedure?

2060


How do you identify an orifice in the pipeline?

1183


what is exact time to study dcs and plc cources

1986


What is the start up procedure of desalter

3613