A genarator is connected through a 20MVA ,13.8/138 KV
stepdown transformer to a transmission line. at the
reciving end of the line a load is supplied through a step
down transformer of 10MVA,138/69 KV rating .A 0.72 PU load
evaluated on load side transformer ratings as base
values ,is supplied from the above system for system base
values of 10 MVA and 69 KV in load circuit the value of the
load in generator circuit will be ...........
Answer Posted / ram
load in the generator circuit will be is 36
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how to measure dc earth leakage current?
Two electric lamps 40 W, 220 V each are connected in series across 220 V. What is the power consumed by the connection?
What is the need of generator relay panel
mccb service sittings be done?
i installed 100kva ups. what KVA genset they should provid in input side? plz any update formula or ans with reason.
In cable sizing calculation (determining the max route length of cable) why we choose the shortest length between cable length of full load current Iflc & starting current Istart?
what r PID controllers?why they r used?what is there purpose?plz Explain in detail
physical identification of HT & LT panel
1.Can we use 6.6/11KV 300sq mm xlpe 3core cable for LT use (415 Volt). 2. If we use it for LT then what is the current rating
In case of salient pole alternator when number of poles are 4 or more than 4 it helps the flux wave to be sinusoid as air gap length is increased from center to tip , but if the number of poles are 2 how does the flux wave is sinusoidal?
What do you mean by an instrument transformer?
which cable is used for 15 Hp monoblock pump 3phase and service wire Distance is 210 feet please tell me cable size Armaured
Why i receive the GCU fault in my DG Sychronization panel . what all the factors considered for this fault .
If we are given a 10 amp cable type and asked to calculate the number of cores used and the thickness of the cable, how do we do it?? please help...urgent!! i hope the question is clear enough!!
Why auxiliary transformers are not connected in parallel in primary stations?