List out the densities of different construction materials
such as brick, steel, sand, aggregate etc...

Answer Posted / r.aravinth raj (kutty)

density of aggregate
WATER-1000kg/cum
R.C.C-2500kg/cum(5% STEEL)
P.C.C-2400kg/cum
CEMENT-1440kg/cum
WOOD-1100kg/cum
BRICKS-1500-1800kg/cum
CRUSHED BRICK-950-1250kg/cum

Is This Answer Correct ?    99 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the five benefits of using standard terminology in the measurement process?

1663


How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/

1356


1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.

2702


manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.

1646


What is the difference between linear dimension and aligned dimension?

634






natucher of concrete &type of concrete?

1897


WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?

1781


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

1404


What are the problems one might face while having a Cantilever balcony?

1039


how to convert sand in Cft to Kgs

1478


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2186


For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)

1520


do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

1207


What does civil engineering mean?

648


what is differences between ferrock and concrete ?

1424