Diagonal check is required for a layout work to confirm ––
Answer Posted / sjtbehera
yes it is to conform the dimension of the respective
structure and distance.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Explain the different types of building contracts?
Explain major difference between auto level and dumpy level?
how to control PQI (Project Quality Index)
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
what is cement wastage percentage in NHAI ROAD WORKS
What is Base Shear ?
Define What are the materials used in building a gravity dam?
What is the difference between a wood shake and wood shingles?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
How much quantity of rod binding work by a rod binder per day
What are the advantages of building a dam on the river nile?
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
difference between fc and fc'?
on what basis the partial factor of safety are decided? form the load combinations